Strategic consultancy, engineered energy solutions and a premium marketplace — all in one place.
Delivering excellence through 15 years of proven experience
Power.
Reimagined.
Advise. Engineer. Supply.
Start wherever your project is today. Each part of Belusi Energy hands you on to the next, so a strategy becomes a working system without changing partners.
Energy Technology & Consultancy
Strategic advisory, feasibility, energy transition and major projects.
Explore Consultancy- Strategy & Planning
- Feasibility Studies
- Technical Advisory
- Project Delivery
Integrated Energy Solutions
Solar, battery storage, hybrid systems, EV infrastructure and customised solutions.
Discover Solutions- Solar
- Energy Storage
- EV Infrastructure
- Hybrid & Microgrids
- Custom
Energy Products & Marketplace
A premium online store for solar, storage, inverters, EV chargers and more.
Shop Products- Solar Panels
- Inverters
- Battery Storage
- EV Chargers
- Mounting
From first idea to a working system
One team carries your project all the way through, so nothing is lost between the study, the design and the delivery.
Start with the numbers
Feasibility, energy baselines and a business case that boards, lenders and investors can act on.
Design one system
Solar, battery storage, EV charging and controls engineered to work together from day one.
Deliver trusted technology
Products from LONGi, Risen, CLOU and other leading partners, matched to the design and supplied direct.
Watch energy move through an integrated site
A 420 kW solar, 800 kWh storage commercial campus, modelled across one day. Drag the time, switch parts of the system off, or cut the grid and see what keeps the lights on.
Time
Conditions
System
Illustrative model for demonstration. Real projects are sized from metered load data during a feasibility study.
Find the right system in three answers
Tell us about your site and what matters most. We'll outline a system, an indicative return, and the best way to start: a consultation or a ready-matched kit.
1What are you powering?
2What matters most?
3How much do you spend on electricity?
Source trusted energy technology
Proudly collaborating with leading brands
Tell us where you are. We'll take it from there.
A specialist replies within one business day with the right next step: an advisory call, a site assessment, or a quote.
Solar Regulations & Incentives in United States
The federal homeowner solar credit ended on 31 December 2025. Business-owned solar can still claim the Section 48E credit, but projects that began construction after 4 July 2026 must be…
The federal homeowner solar credit ended on 31 December 2025. Business-owned solar can still claim the Section 48E credit, but projects that began construction after 4 July 2026 must be in service by 31 December 2027.
Regulations and grid connection
- Interconnection and net-metering rules are set by each state utility commission and utility; many states have moved from net metering to net billing.
- Larger projects connecting to transmission follow regional operator queues under federal (FERC) rules.
- Local building and electrical permits are required; some jurisdictions use automated permitting tools.
Certifications
- Modules listed to UL 61730, inverters to UL 1741 (including grid-support SB where required) and batteries to UL 9540 / UL 9540A.
- Installations follow the National Electrical Code (NFPA 70), including rapid shutdown under Article 690.
- EV chargers are typically listed to UL 2594 / UL 2202.
Incentives and funding
- Section 25D residential clean energy credit: ended for expenditures after 31 December 2025. Homeowners buying a system get no federal credit; third-party-owned (lease or PPA) systems may still use 48E.
- Section 48E clean electricity investment credit: 30% base rate for business-owned solar and storage, with bonus credits for domestic content and energy communities. Solar that began construction after 4 July 2026 must be placed in service by 31 December 2027.
- State, utility and local incentives vary widely; check the DSIRE database for your address.
Installation rules
- Licensed electrical contractor, local building and electrical permits, and a utility interconnection agreement before switching on.
- For tax-credit projects, keep records that prove when construction began (the physical work test) and continuous progress.
Compliance
- Commercial rooftop and community solar remain viable under 48E within the deadlines, often with third-party financing and tax-credit transfer.
- Utility-scale solar and storage are procured by utilities and corporate buyers; standalone storage is not subject to the 2027 solar deadline.
- Bonus credits are available for domestic content and projects in designated energy communities.
What’s changing
- 2027-12: Solar facilities that began construction after 4 July 2026 must be placed in service by 31 December 2027 to claim Sections 48E or 45Y.
- 2026-01: Foreign-entity-of-concern restrictions apply to projects that begin construction from 1 January 2026.
Official sources
- IRS — Residential Clean Energy Credit (25D)
- IRS — Clean Electricity Investment Credit (48E)
- IRS Notice 2025-42 — beginning of construction
- DSIRE — state and local incentives
- NFPA 70 — National Electrical Code
Last verified 9 November 2026.