Solar Regulations & Incentives in Mexico

Under the 2025 Electricity Sector Law, plants under 0.7 MW are exempt distributed generation. Self-consumption from 0.7 to 20 MW has a simplified permit from the CNE.

Under the 2025 Electricity Sector Law, plants under 0.7 MW are exempt distributed generation. Self-consumption from 0.7 to 20 MW has a simplified permit from the CNE.

Regulations and grid connection

  • Distributed generation under 0.7 MW needs no generation permit; net metering and net billing details are still being defined.
  • Interconnected self-consumption of 0.7–20 MW has a simplified CNE permit.

Official sources

Last verified 9 November 2026.