Strategic consultancy, engineered energy solutions and a premium marketplace — all in one place.
Delivering excellence through 15 years of proven experience
Power.
Reimagined.
Advise. Engineer. Supply.
Start wherever your project is today. Each part of Belusi Energy hands you on to the next, so a strategy becomes a working system without changing partners.
Energy Technology & Consultancy
Strategic advisory, feasibility, energy transition and major projects.
Explore Consultancy- Strategy & Planning
- Feasibility Studies
- Technical Advisory
- Project Delivery
Integrated Energy Solutions
Solar, battery storage, hybrid systems, EV infrastructure and customised solutions.
Discover Solutions- Solar
- Energy Storage
- EV Infrastructure
- Hybrid & Microgrids
- Custom
Energy Products & Marketplace
A premium online store for solar, storage, inverters, EV chargers and more.
Shop Products- Solar Panels
- Inverters
- Battery Storage
- EV Chargers
- Mounting
From first idea to a working system
One team carries your project all the way through, so nothing is lost between the study, the design and the delivery.
Start with the numbers
Feasibility, energy baselines and a business case that boards, lenders and investors can act on.
Design one system
Solar, battery storage, EV charging and controls engineered to work together from day one.
Deliver trusted technology
Products from LONGi, Risen, CLOU and other leading partners, matched to the design and supplied direct.
Watch energy move through an integrated site
A 420 kW solar, 800 kWh storage commercial campus, modelled across one day. Drag the time, switch parts of the system off, or cut the grid and see what keeps the lights on.
Time
Conditions
System
Illustrative model for demonstration. Real projects are sized from metered load data during a feasibility study.
Find the right system in three answers
Tell us about your site and what matters most. We'll outline a system, an indicative return, and the best way to start: a consultation or a ready-matched kit.
1What are you powering?
2What matters most?
3How much do you spend on electricity?
Source trusted energy technology
Proudly collaborating with leading brands
Tell us where you are. We'll take it from there.
A specialist replies within one business day with the right next step: an advisory call, a site assessment, or a quote.
Solar Regulations & Incentives in United Kingdom
Homes pay 0% VAT on solar and batteries until 31 March 2027, and can sell surplus power through the Smart Export Guarantee. A new government-backed Warm Homes Loan launched in…
Homes pay 0% VAT on solar and batteries until 31 March 2027, and can sell surplus power through the Smart Export Guarantee. A new government-backed Warm Homes Loan launched in October 2026.
Regulations and grid connection
- Smaller systems connect under the ENA G98 notification process; larger or three-phase systems need prior approval from the distribution network operator under G99.
- Most domestic rooftop solar is permitted development in England and does not need planning permission, with exceptions for listed buildings and conservation areas.
- Ground-mounted and larger commercial arrays usually need planning permission and a grid connection offer.
Certifications
- MCS certification of the installer and products is required to access the Smart Export Guarantee and most finance schemes.
- Installations must comply with BS 7671 wiring regulations. Amendment 4 was published on 15 April 2026.
- Modules are commonly certified to IEC 61215 and IEC 61730; inverters must meet the relevant G98 or G99 type-test requirements.
Incentives and funding
- 0% VAT on the installation of solar panels and batteries in homes, until 31 March 2027.
- Warm Homes Loan Scheme (launched October 2026): government-backed interest-free or low-interest loans of up to £15,000 for solar and £15,000 for a battery, through approved lenders.
- Smart Export Guarantee: licensed suppliers must offer a tariff for exported power from MCS-certified systems up to 5 MW. Rates vary by supplier.
- Low-income households may qualify for fully funded solar and batteries through the Warm Homes Plan and local schemes.
Installation rules
- Use an MCS-certified installer for domestic work, and get the electrical installation certificate and MCS certificate at handover.
- Notify or apply to the network operator (G98/G99) before connecting.
- Check roof structure, fire safety and, for larger systems, the export limit set in the connection offer.
Compliance
- Commercial rooftop solar is typically paired with on-site use and corporate power purchase agreements; standard 20% VAT applies.
- Utility-scale solar and storage compete in the Contracts for Difference allocation rounds and need grid connection under the reformed connections process.
- Battery storage can earn from balancing and capacity markets in addition to on-site savings.
What’s changing
- 2027-03: 0% VAT on residential solar and batteries is due to end on 31 March 2027.
- 2027-03: The Future Homes Standard requires solar on most new homes in England from 24 March 2027.
- 2026-03: The government committed in March 2026 to consult on changes to the Smart Export Guarantee.
Official sources
- HMRC — VAT on energy-saving materials (Notice 708/6)
- Ofgem — Smart Export Guarantee
- MCS — certified installers and products
- Energy Networks Association — connecting generation
- GOV.UK — energy efficiency help for your home
Last verified 9 November 2026.