Skip to content

Solar Regulations & Incentives in United States

The federal homeowner solar credit ended on 31 December 2025. Business-owned solar can still claim the Section 48E credit, but projects that began construction after 4 July 2026 must be…

The federal homeowner solar credit ended on 31 December 2025. Business-owned solar can still claim the Section 48E credit, but projects that began construction after 4 July 2026 must be in service by 31 December 2027.

Regulations and grid connection

  • Interconnection and net-metering rules are set by each state utility commission and utility; many states have moved from net metering to net billing.
  • Larger projects connecting to transmission follow regional operator queues under federal (FERC) rules.
  • Local building and electrical permits are required; some jurisdictions use automated permitting tools.

Certifications

  • Modules listed to UL 61730, inverters to UL 1741 (including grid-support SB where required) and batteries to UL 9540 / UL 9540A.
  • Installations follow the National Electrical Code (NFPA 70), including rapid shutdown under Article 690.
  • EV chargers are typically listed to UL 2594 / UL 2202.

Incentives and funding

  • Section 25D residential clean energy credit: ended for expenditures after 31 December 2025. Homeowners buying a system get no federal credit; third-party-owned (lease or PPA) systems may still use 48E.
  • Section 48E clean electricity investment credit: 30% base rate for business-owned solar and storage, with bonus credits for domestic content and energy communities. Solar that began construction after 4 July 2026 must be placed in service by 31 December 2027.
  • State, utility and local incentives vary widely; check the DSIRE database for your address.

Installation rules

  • Licensed electrical contractor, local building and electrical permits, and a utility interconnection agreement before switching on.
  • For tax-credit projects, keep records that prove when construction began (the physical work test) and continuous progress.

Compliance

  • Commercial rooftop and community solar remain viable under 48E within the deadlines, often with third-party financing and tax-credit transfer.
  • Utility-scale solar and storage are procured by utilities and corporate buyers; standalone storage is not subject to the 2027 solar deadline.
  • Bonus credits are available for domestic content and projects in designated energy communities.

What’s changing

  • 2027-12: Solar facilities that began construction after 4 July 2026 must be placed in service by 31 December 2027 to claim Sections 48E or 45Y.
  • 2026-01: Foreign-entity-of-concern restrictions apply to projects that begin construction from 1 January 2026.

Official sources

Last verified 9 November 2026.

Countries