Solar Regulations & Incentives in United Kingdom

Homes pay 0% VAT on solar and batteries until 31 March 2027, and can sell surplus power through the Smart Export Guarantee. A new government-backed Warm Homes Loan launched in…

Homes pay 0% VAT on solar and batteries until 31 March 2027, and can sell surplus power through the Smart Export Guarantee. A new government-backed Warm Homes Loan launched in October 2026.

Regulations and grid connection

  • Smaller systems connect under the ENA G98 notification process; larger or three-phase systems need prior approval from the distribution network operator under G99.
  • Most domestic rooftop solar is permitted development in England and does not need planning permission, with exceptions for listed buildings and conservation areas.
  • Ground-mounted and larger commercial arrays usually need planning permission and a grid connection offer.

Certifications

  • MCS certification of the installer and products is required to access the Smart Export Guarantee and most finance schemes.
  • Installations must comply with BS 7671 wiring regulations. Amendment 4 was published on 15 April 2026.
  • Modules are commonly certified to IEC 61215 and IEC 61730; inverters must meet the relevant G98 or G99 type-test requirements.

Incentives and funding

  • 0% VAT on the installation of solar panels and batteries in homes, until 31 March 2027.
  • Warm Homes Loan Scheme (launched October 2026): government-backed interest-free or low-interest loans of up to £15,000 for solar and £15,000 for a battery, through approved lenders.
  • Smart Export Guarantee: licensed suppliers must offer a tariff for exported power from MCS-certified systems up to 5 MW. Rates vary by supplier.
  • Low-income households may qualify for fully funded solar and batteries through the Warm Homes Plan and local schemes.

Installation rules

  • Use an MCS-certified installer for domestic work, and get the electrical installation certificate and MCS certificate at handover.
  • Notify or apply to the network operator (G98/G99) before connecting.
  • Check roof structure, fire safety and, for larger systems, the export limit set in the connection offer.

Compliance

  • Commercial rooftop solar is typically paired with on-site use and corporate power purchase agreements; standard 20% VAT applies.
  • Utility-scale solar and storage compete in the Contracts for Difference allocation rounds and need grid connection under the reformed connections process.
  • Battery storage can earn from balancing and capacity markets in addition to on-site savings.

What’s changing

  • 2027-03: 0% VAT on residential solar and batteries is due to end on 31 March 2027.
  • 2027-03: The Future Homes Standard requires solar on most new homes in England from 24 March 2027.
  • 2026-03: The government committed in March 2026 to consult on changes to the Smart Export Guarantee.